DIVISIÓN CODELCO NORTE
DIVISIÓN CODELCO NORTE |
Inversión Estimada (Miles de US$) |
||
DESCRIPCION |
AÑO 2006 |
AÑO 2007 |
SGTES |
SERVICIOS E INFRAESTRUCTURA |
0 |
16.450 |
3.300 |
REEMPLAZO CARGADORES HORCAJADA |
0 |
1.000 |
1.000 |
REEMPLAZO CAMIONES ESCORIA |
0 |
2.100 |
0 |
REEMPLAZO GRUAS |
0 |
1.700 |
2.300 |
ADQUISICION CAMIONES DE SERVICIO |
0 |
4.950 |
0 |
ADQUISICION GRUAS HORQUILLAS |
0 |
6.700 |
0 |
INNOVACION E INVESTIGACION TECNOLOGICA |
2.143 |
6.320 |
139 |
CTROL OPTIMIZ FLOT PRIM Y LIMP PTA MOLY |
50 |
50 |
0 |
IMPLANTAC MOLIMAX CERTIFICACION RESULTAD |
100 |
200 |
0 |
PROTOTIPO MAQ AUX CAMBIO REVESTIMIENTOS |
200 |
600 |
0 |
FLOTACION FINOS Y ULTRAFINOS FASE II PBA |
150 |
350 |
0 |
LIXIV PRESION CONCENT MOLIB FAS II PR PI |
100 |
112 |
0 |
DESARR TECN DEPOS RELAV ESPESADOS |
100 |
200 |
0 |
RECUPERAC MO DESDE COLA MO FASE II |
100 |
100 |
0 |
SELECTIVIDAD MINA FASE II |
50 |
150 |
0 |
FITORREMEDIACION DE SUELDOS |
103 |
75 |
0 |
TOBERAS AUTOLIMPIANTES |
100 |
400 |
0 |
RECUPERACION ZINC APLICAC INDUST |
150 |
150 |
0 |
SISTEMA EXPERTO PREDICTIVO SIGNOS VITALE |
60 |
40 |
0 |
INTEGRACION MINA PLANTA FASE II |
60 |
30 |
0 |
AUTOMATIZACION MAQUINA DE CATOD RECHAZ |
220 |
242 |
0 |
EVALUAC Y VALIDAC PICKET FENCE TIPO DDG |
50 |
62 |
0 |
RECUPERAC MOLIB COBRE SULF FERRIC ESC FU |
50 |
58 |
0 |
LIS TOKI DISEÑO PRUEBA INDS ESTU ING |
500 |
1.200 |
0 |
MINERALOGIA EN LINEA - FASE IV |
0 |
100 |
0 |
PLAN DE ACCIONES TECNOLOG APOYO P1 DCN |
0 |
200 |
0 |
FLOTACION DE FINOS Y ULTRAFINOS |
0 |
500 |
0 |
SIST REBOTIZADO LIMP HORNO TOST IMPLANT |
0 |
100 |
0 |
SIST ROBOTIZADO LIMP HORNO TOST CERT RES |
0 |
50 |
0 |
USO DESECHOS DE CAL DE CTM EN CONC. |
0 |
60 |
0 |
SELECT PEBBLES SAG VALIDAC HIP DIST LEYE |
0 |
100 |
0 |
COLECTORES CONCENTRICOS PARABOLICOS |
0 |
250 |
0 |
MAGNETO CATALIZADORES |
0 |
150 |
0 |
ESTUDIO USO HIDROGENO EN DCN |
0 |
100 |
0 |
CAIDA DIENTE PALA |
0 |
90 |
10 |
CAMION VLT DEVOLUCION KOMATSU |
0 |
150 |
0 |
SIST EXPERTO PREDICT SIGNOS VITALES PALA |
0 |
100 |
0 |
INTEGRACION MINA - PLANTA FASE III |
0 |
30 |
0 |
RIPIOS SUBYACENTES RMS FASE II |
0 |
321 |
129 |
GASTOS DIFERIDOS |
135.803 |
159.667 |
157.639 |
TRASLADO CALAMA |
123.605 |
3.110 |
0 |
DESCARGA LASTER PARED OESTE |
12.198 |
30.800 |
0 |
DESARROLLO MINA CHUQUICAMATA |
0 |
123.757 |
157.389 |
RECONOCIMIENTO GEOLOG SECT MINA CHQU |
0 |
2.000 |
250 |
INVERSIONES VIA API SEGÚN GASTO |
232.150 |
487.041 |
185.926 |
CAMBIO TECNOL PROCESO ELECTRO-REFINAC |
33.690 |
1.163 |
0 |
MEJORAM SIST ALUMBRADO INSTALAC GCIA REF |
1.024 |
601 |
0 |
Sistema Drenaje ENMS Fase II y III |
11.454 |
7.084 |
0 |
EIMINCO FURE |
42.028 |
199.163 |
6.665 |
ING BAS MEJ CON SUB SALA BATERIAS S/E AT |
269 |
0 |
0 |
ING BAS MEJ COND SUB ILUM S/E A.T. CHUQU |
216 |
0 |
0 |
CAMBIO TECNOL PROCESO ELECTRO-REFINAC |
3.500 |
187 |
0 |
MEJORAM SIST ALUMBRADO INSTALAC GCIA REF |
0 |
155 |
0 |
Sistema Drenaje ENMS Fase II y III |
-1.209 |
1.208 |
0 |
EIMINCO FURE |
-802 |
-2.756 |
3.567 |
ING BAS MEJ CON SUB SALA BATERIAS S/E AT |
-61 |
61 |
0 |
ING BAS MEJ COND SUB ILUM S/E A.T. CHUQU |
-53 |
53 |
0 |
ALMACENAM ACIDO SULFURICO CORPORATIVO CN |
5.831 |
5.529 |
0 |
REEMP 4 PALAS 34 YD3 MINA CHUQUICAMATA |
31.946 |
411 |
0 |
REEMP SISTEMA ADITIVOS EN REFINERIA 2 |
1.314 |
345 |
0 |
AUMENTO FLOTA PALAS 2007 MINA RT |
60 |
16.265 |
886 |
AUMENTO FLOTA PERFORAD 2007 MINA RT |
77 |
4.086 |
0 |
ADQUISICION BARRAS EQUIPOTENCIALES |
833 |
267 |
0 |
MEJ COND SUB SIST ELEC FLOTAC A0 Y MOLIE |
180 |
9.575 |
905 |
MODERNIZ SIST CTROL MOL SAG CONCENT A2 |
651 |
3.158 |
4.106 |
ITEM 1 DELINEAM EXPLOTACION SULFUROS RT |
8.022 |
7.472 |
0 |
ITEM 2 EST ING EXPLOTACION SULFUROS RT |
1.894 |
476 |
0 |
ACIDUCTO A TERMINAL DE ACIDO CN |
1.457 |
2.642 |
0 |
EXPL.Y EVAL.HIDROG DE CACHIMBA |
1.760 |
244 |
0 |
EXPL HIDROGEOLOG SECTOR NORESTE TALABRE |
1.694 |
163 |
0 |
ELIMNACION CONDIC SUBEST TERMINAL ACIDO |
1.052 |
4.461 |
0 |
HABILITACION CASINO INDUSTRIAL CHUQUI |
1.037 |
1.034 |
258 |
REEMP MAQ ENLAINADORA MOL BARRA CONC A2 |
800 |
413 |
0 |
AUM CAP TRANQUE TALABRE VI ETAPA MUROS |
974 |
15.931 |
29.223 |
ING.PERFIL Y EXPL.AVAN. MM SBTERRANEA |
13.200 |
8.800 |
0 |
INGENIERIA DE PERFIL CLUSTER TOKI |
5.000 |
12.300 |
0 |
REEMP PESOMET Y CORTAD MUESTRAS CORR AL |
725 |
4.295 |
541 |
ACTUALIZACION PERFORADORAS 4 x 3 CN DMH2 |
46 |
12.129 |
0 |
CONST CHIM Y SIST VENTILAC CAVER CHAN M1 |
2.178 |
2.172 |
541 |
ADQ GRUA UNIDAD REPARAC COMP MAYOR MINA |
37 |
1.136 |
0 |
TRASLADO INSTALAC POR EXPANSION 38 SUR D |
1.290 |
3.470 |
0 |
AMPLIACION NAVES CAMIONES RT |
56 |
2.746 |
0 |
AUMENTO FLOTA CAMIONES PND 2006 |
44.728 |
18.388 |
0 |
LIX SECUNDARIA RIPIOS FASE V |
13.011 |
10.000 |
0 |
LIXIVIACION MINERALES OBL DUMP 3 |
2.242 |
15.691 |
0 |
SISTEMA AISLAMIENTO SILOS MOLIENDA CONV |
0 |
1.533 |
0 |
NORMALIZACION CON SUBEST TUNELES ELEC |
0 |
397 |
595 |
NORMALIZAC SISTE ELECT EMERGENC PTA CONC |
0 |
500 |
2.500 |
ING CONC REEMPL Y AUTOM VALVULA AUMAC |
0 |
450 |
0 |
SISTEMA DRENAJE MINA CHUQUI, FASE II |
0 |
2.500 |
12.500 |
MODELO RIESGO GEOTECNICO MINA CHUQ |
0 |
800 |
3.500 |
DELINEAC Y DESCARTE HIDROG SECT CORD MED |
0 |
1.000 |
800 |
ESTUDIO ALTERNATIVAS TRANQUE RELAVE |
0 |
1.000 |
800 |
CONSOLIDACION HIDROGEOLOGIA ASCOTAN NOR |
0 |
600 |
0 |
ESTUDIO ALTERNATIVAS TRANQUE RELAVE |
0 |
1.500 |
1.000 |
MODELO HIDRAUL RIO LOA TRAM ALTO Y BAJO |
0 |
400 |
1.300 |
PLAN ESTRAT EXPLORACION PEX PND FASE I |
0 |
2.500 |
3.000 |
ING BAS SULF RT SECTOR SUR CENTRAL NORT |
0 |
4.000 |
10.000 |
REEMPLAZO EQUIPOS ESPECIALIZADOS LOB |
0 |
1.000 |
1.100 |
CORREDOR BIOLOGICO DEL RIO SAN PEDRO |
0 |
1.200 |
0 |
ING CONC CONS 2DO VERT RESID INDU NO PEL |
0 |
500 |
0 |
OBRAS CIVILES DE MEJORAM REPOSIC RUTA 50 |
0 |
6.000 |
5.000 |
ING CONC LOGISTICA INTEGRAL |
0 |
250 |
0 |
ING CONC ALIMENTACION AGUA PND |
0 |
2.200 |
0 |
ING CONC REUBICACION PONDS SX |
0 |
200 |
0 |
NG PERFIL Y PRUBAS PILOTO LIS BOT 67 |
0 |
600 |
900 |
ING CONC DUMP OXIDOS MM |
0 |
800 |
0 |
ING PERFIL SULFUROS RT |
0 |
1.000 |
1.500 |
ING PERFIL CLUSTER TOKI |
0 |
3.000 |
1.000 |
ING BAS LIXIV RIPIOS SUBYACENTES |
0 |
200 |
0 |
ING BAS LIXIVIAC RENMS EN MEZCLA CON RCH |
0 |
800 |
0 |
ING LIXIVIACION DE RMS EN MEZCLA RCHUQUI |
0 |
250 |
450 |
ING BAS AUMENT CAPAC CANCHA RIPIOS RT |
0 |
350 |
0 |
ING BAS AUMENT CAPAC CANCHA RIPIOS ENMS |
0 |
350 |
0 |
ING BAS DUMP 3 |
0 |
500 |
0 |
ING CONC PROCESAMIENTO DE ARF |
0 |
1.500 |
0 |
ING BAS REEMP PRECIP ESLEC-VTA PTA AC 2A |
0 |
186 |
0 |
REEMP COMP PRECI MILJO CTE 2 |
0 |
750 |
0 |
ING BAS MEJORAM H ELEC Y PTA GRANALLA |
0 |
500 |
0 |
REEMPLAZO CASCO CPS 6 |
0 |
200 |
1.000 |
REEMP TRACTO NEUM 610 611 |
0 |
1.490 |
0 |
REEMP MOTONIVELADORA 790 |
0 |
582 |
0 |
REEMP CAMION CARGADOR |
0 |
1.300 |
0 |
AUMENTO CAMION REGADOR |
0 |
1.300 |
0 |
AUMENTO TRACTOR NEUMATICO 824 |
0 |
1.200 |
0 |
AUMENTO TRACTOR ORUGA TIP 475A |
0 |
1.400 |
0 |
AUMENTO MOTONIVELADORA TIPO 24H |
0 |
1.100 |
0 |
AUMENTO RETROEXCAVADORA |
0 |
600 |
0 |
REEMP. MANIPULADOR DE NEUMÁTICOS 4X4 |
0 |
2.000 |
800 |
REEMP PERFORAD CONTROL PARED |
0 |
1.500 |
0 |
AUMENTO MANIPULADOR NEUMATICO |
0 |
1.400 |
0 |
REFACCION ESTRUCTURA TOLVA GRUESA |
0 |
800 |
0 |
RETROEX B LARGO C MARTILL BALDE ASEO TAZ |
0 |
700 |
0 |
TRASLADO EQUIPOS CAVERNA TÚNEL SERV CHAN |
0 |
500 |
1.000 |
ALTERNAT NUEVO LAY-OUT REPASO SECC D Y E |
0 |
500 |
1.500 |
REDUCC GRANULOMET CHANC SEC-TERC |
0 |
500 |
3.000 |
ING BAS AUTOMATIZACION CARROS REPARTIDOR |
0 |
180 |
0 |
OVERHAUL CARGADOR FRONTAL 880 |
0 |
600 |
0 |
AMPLIACION NAVES CAMIONES RT |
0 |
800 |
2.200 |
SISTEMA ILUMINACION PLANTAS Y MINAS |
0 |
1.000 |
2.000 |
INFRAESTRUCTURA TALLER COMPONENTES MAYOR |
0 |
1.532 |
0 |
REEMP RED HUMEDA PLANTAS REF |
0 |
200 |
1.300 |
OVER HAUL GRUAS NAVE CENTRAL REF N 2 |
0 |
100 |
600 |
REFUERZ ESTR VIGAS Y COLUM CELD |
0 |
200 |
2.300 |
ING BAS TRAMIENTO IMPUREZAS REFINERIAS |
0 |
600 |
0 |
ING BAS SUSTENTABILIDAD AREA LIX Y TOS |
0 |
250 |
0 |
REEMPLAZO FLOTA CAT 793C |
0 |
21.000 |
21.000 |
REEMPLAZO PERFO 101 |
0 |
3.500 |
0 |
REEMPLAZO CARGADOR L 1400 |
0 |
4.500 |
0 |
AUMENTO FLOTA CAEX 5 KON 930E |
0 |
7.500 |
10.000 |
MEJ CONDI SUBEST ILUMINAC SUBESTAC AT |
0 |
260 |
740 |
MEJ COND SUBESTAND SALAS BATERIAS |
0 |
260 |
740 |
ING CONC REEMP EQU SUBESTAC ALTA TENS |
0 |
162 |
0 |
TRASLADO TALLERES SUPTCIA RECH HIDR |
0 |
720 |
0 |
ING BAS REPOSICION ACTIVOS |
0 |
578 |
0 |
MEJORAMIENTO CALIDAD DEPOS CATOD EN EW |
0 |
100 |
900 |
UP GRADE SISTEMA TRASPORTE RIPIOS |
0 |
3.074 |
7.173 |
MEJORAM SISTE EXTRAC GASES NAVE EW |
0 |
220 |
1.278 |
INGENIERIA BASISCA DUMP 3 |
0 |
600 |
0 |
MEJORAMIENTO SISTEMA CONTRA INCENDIO HN |
0 |
100 |
1.100 |
TRASLADO Y MEJORAM MAQUINAS NAVE EW |
0 |
2.000 |
1.500 |
INTERFERENCIA ENMS FASE IX |
0 |
2.000 |
26.508 |
CAMBIO DE 200 CELDAS EW HS |
0 |
1.000 |
1.200 |
REFACCION ESTRUCTURA NAVE EW HS |
0 |
2.000 |
0 |
MEJORAMIENTO RED CONTRAINCEND PTA SX HS |
0 |
2.000 |
2.200 |
ING BASICA MEZCLA RHQ RMS |
0 |
250 |
450 |
ING BASICA ALIMENTAC CAPAC CANCHA RIPIOS |
0 |
350 |
0 |
ING CONCEPTUAL OXIDOS MM |
0 |
800 |
0 |
ING CONCEPTUAL REUBICAC POND PLS |
0 |
200 |
0 |
ING PERF Y PRUE PILOT LIX IN SITU BOT 67 |
0 |
600 |
900 |
ING BAS LIXI BOTADEROS RBL Y J1 |
0 |
900 |
1.900 |