DIVISIÓN ANDINA
DIVISIÓN ANDINA |
Inversión Estimada (Miles de US$) |
||
DESCRIPCION |
AÑO 2006 |
AÑO 2007 |
SGTES |
SERVICIOS E INFRAESTRUCTURA |
1.809 |
3.262 |
26.366 |
REEMPLAZO CHANCADOR TER-CUATERNARIO 1RO |
270 |
270 |
517 |
REEMPLAZO SEGUNDO CHANCADOR TERCIARIO |
232 |
232 |
638 |
ARRIENDO EDIFICIO OFICINAS LOS ANDES |
782 |
782 |
11.909 |
CONSTRUCCION COMPLEJO POLIDEPORTIVO |
234 |
234 |
4.154 |
REEMPLAZO 7 CAMIONES 50 TON MINA SUBTE. |
205 |
1.229 |
7.169 |
REEMPLAZO 6 LHD DESARROLLO MINA SUBTE.RE |
86 |
516 |
1.978 |
INNOVACION E INVESTIGACION TECNOLOGICA |
0 |
932 |
0 |
USO SUBPROD Y DERIVA EXPLOTA YACIMIENTO |
0 |
225 |
0 |
LIXIVIA IN SITU BLOQUES PREACONDICIONADO |
0 |
56 |
0 |
TECNOLOGIA BARRIDO NIEVE ALTO RENDIMIENT |
0 |
92 |
0 |
ALTER TECNO MITIGAR CONTAMINA MINA SUBTE |
0 |
196 |
0 |
ALTERNATIVAS REDUCCION SULFATOS EFLUENTE |
0 |
77 |
0 |
ALTERNATIVAS LIXIVIACION CALCOPIRITA |
0 |
286 |
0 |
GASTOS DIFERIDOS |
50.510 |
102.627 |
124.180 |
PREPARA BLOCK CAVING AREA 14 PARRILLAS |
3.093 |
1.049 |
0 |
PREP SECTOR LHD AREA 13 TERCER PANEL |
12.470 |
11.796 |
0 |
PREP SECTOR PARRILLA AREA 13 TERCER PANE |
4.259 |
1.471 |
0 |
PREPARA SECTOR LHD AREA 14 TERCER PANEL |
11.245 |
24.464 |
5.371 |
PREP SECTOR LHD AREA 15 TERCER PANEL |
4.784 |
17.577 |
20.622 |
OBRAS DESARROLLO EXPLOTACION SUR SUR |
11.748 |
12.548 |
5.151 |
PREP SECTOR PARRILLA AREA 14B 3ER PANEL |
2.911 |
2.913 |
678 |
PREPARACION AREA 15 PARRILLAS MINA SUBTE |
0 |
5.360 |
7.596 |
PREPARACION AREA 17 LHD MINA SUBTERRANEA |
0 |
1.394 |
46.304 |
PREP SECTOR LHD AREA 16 3ER PANEL |
0 |
8.519 |
22.920 |
PREPARACIÓN FASE 3 MINA RAJO DON LUIS |
0 |
15.536 |
15.538 |
INVERSIONES VIA API SEGÚN GASTO |
71.956 |
291.727 |
310.810 |
RECONOCIMIENTO RIO BLANCO NV 17 A NV23 |
5.953 |
191 |
0 |
PBA PILOT. A ESC. SEMI IND. LIXI EN PILA |
6.173 |
1.449 |
1.389 |
REPAR TOLVA FINO C ALIM PTA MOL |
1.285 |
115 |
0 |
INVER. DESP. DRENAJES BOT. A UTIL. EXT. |
26.359 |
948 |
0 |
MEJORAMIENTO SIS. TRASPASO MINERAL NV 8 |
1.093 |
1.339 |
0 |
IMPLEMENTACION SIST LECHADA CAL CO |
1.090 |
681 |
0 |
ELIM DESCARGAS BOCATOMAS HAULAGE I, ESP |
1.011 |
886 |
0 |
MEJORAMIENTO CORTES EN ROCA STR |
830 |
1.043 |
0 |
HABILITA RESPALDO SUM ELECTRICO ETAPA 1 |
5.031 |
316 |
0 |
RECONOCIMIENTO RIO BLANCO NV 17 A NV23 |
-6 |
6 |
0 |
PBA PILOT. A ESC. SEMI IND. LIXI EN PILA |
-464 |
336 |
133 |
REPAR TOLVA FINO C ALIM PTA MOL |
-178 |
178 |
0 |
INVER. DESP. DRENAJES BOT. A UTIL. EXT. |
-3.143 |
3.117 |
0 |
MEJORAMIENTO SIS. TRASPASO MINERAL NV 8 |
-1 |
0 |
0 |
IMPLEMENTACION SIST LECHADA CAL CO |
-72 |
73 |
0 |
ELIM DESCARGAS BOCATOMAS HAULAGE I, ESP |
869 |
-851 |
0 |
MEJORAMIENTO CORTES EN ROCA STR |
-270 |
270 |
0 |
HABILITA RESPALDO SUM ELECTRICO ETAPA 1 |
1.870 |
452 |
0 |
EST TECNOL MINERIA SUBT CONTINUA FASE 2 |
1.966 |
341 |
0 |
ING BAS PISCINA SEG Y PTA TRAT EFLUENTES |
625 |
625 |
0 |
REEMPL VARIADORES VENTILADORES MINA SUBT |
41 |
1.489 |
0 |
MEJORAMIENTO DISTRIBUCION AIRE MS |
85 |
2.924 |
0 |
REEMPLAZO JUMBOS MINA SUBTERRÁNEA |
8 |
1.213 |
0 |
MEJORA SIST VENT EXTR POLVO PTA CHANCADO |
268 |
2.496 |
0 |
DESPACHO DRENAJES BOTAD UT EXT LA UNION |
250 |
3.792 |
3.942 |
TUNEL DESVIO RIO BLANCO - BOTADERO NORTE |
756 |
21.325 |
12.062 |
PLAN DESARROLLO NUEVA ANDINA - FASE I |
6.170 |
114.345 |
94.242 |
MEJORAMIENTO SELLADO CUBETA EMB OVEJERIA |
1.842 |
3.153 |
0 |
CASA CAMBIO TERCEROS NAVE MARC |
1.500 |
1.500 |
0 |
CASA CAMBIO TERCEROS MS-CO SALADILLO |
3.000 |
1.670 |
0 |
CONSTRUCCION BY-PASS TOLVA 7000 TON |
91 |
3.110 |
496 |
ADQUISICION 3 MARTILLOS MOVILES MS |
8 |
1.346 |
0 |
PROYECTO PLAN DESARROLLO MINA RAJO |
5.515 |
57.053 |
115.113 |
CONSTRUCCIÓN CASA DE CAMBIO HUECHUN |
2.000 |
500 |
0 |
AMPLIA COMEDORES NV 16 MINA SUBTE |
400 |
400 |
0 |
INGBAS PROYECTO NUEVA ANDINA EXP MINCO |
0 |
20.000 |
20.000 |
INGENIERIA CONCEPTUAL MINA SUR SUR SUBTE |
0 |
1.667 |
1.111 |
RECONOCIMIENTO PERIMETRAL RAJO PDA |
0 |
7.569 |
7.029 |
ING BASICA PROYECTO SULFUROS BAJA LEY |
0 |
2.500 |
0 |
HABILITA RESPALDO MANTENCION TOLVA SAG |
0 |
4.000 |
4.900 |
REEMPLAZO LÍNEA ALIMENTACIÓN RELAVES 1 |
0 |
3.588 |
0 |
MEJORA CONDICIONES SANITARIAS Y AMB GPTA |
0 |
1.500 |
0 |
MEJORA ASCENSOR INDUSTRIAL CHANC GRUESO |
0 |
300 |
418 |
NORMALIZA. Y CONSTR. LUBRICANTERAS CHANC |
0 |
600 |
363 |
REEMPLAZO CALEFACTORES MINA SUBTERRÁNEA |
0 |
600 |
2.200 |
REEMPLAZO MARTILLOS FIJOS MINA SUBTE. |
0 |
920 |
0 |
REEMPLAZO CABLE SUBTERRANEO |
0 |
5.653 |
412 |
CONSTR SOLUCION AMB EFLUENTES BOTADEROS |
0 |
15.000 |
47.000 |